Written by Ronda Burson

Bonita Beach Club Condo Remodel

This remodel project is one of many we have completed at the Bonita Beach Club. Sitting right on Bonita Beach, FL we performed:

  • An entire demo of the condo, including removing the existing drywall, flooring, cabinets, countertops and all fixtures
  • We removed walls to open the space between the kitchen and dining room
  • All new fixtures, appliances, doors and trim were added
  • New custom made closet shelving was installed

Custom Cabinetry – Made in the USA

New custom cabinets, by StarMark Cabinetry, were installed in the kitchen that now flow out into the dining room. This helped create additional storage and counter space,  as well as visual appeal. We also designed and installed custom cabinets in the guest bedroom to create a built in workspace. New cabinets were installed in both bathrooms as well.

Photo Gallery

View our complete condo remodel in less than 2 minutes

Learn More

Click to view our other projects or contact us to find out how to get started on your own project.

Written by Ronda Burson

Estero Wine Cellar

Estero, Florida – This commercial remodel was to convert existing self storage space into an air-conditioned wine cellar.

This project required relocation of the air handler, electrical and sprinkler heads.  Additional fire sprinkler heads were added.  Drywall was removed to add insulation to existing walls.  Removal of floor paint and carpeting was necessary to replace with floor tile.  8 ft walls were framed from floor to ceiling to construct new wine lockers to match existing ones.  Closed cell spray foam insulation with vaper barrier in wall cavity of wine cellar was installed.

 

Written by Ronda Burson

Waterford at Lexington Master Bath Remodel

January 2015: Fort Myers, Florida – This master bath remodel includes removal of cabintery, counter tops and plumbing to be replaced with all new, including a new vanity light fixture.  New shower wall and floor tile will adorn the bathroom.

 

Written by Ronda Burson

Country Creek Kitchen & Bath Remodel

November 2014: Estero, Florida – New cabinets and countertops were installed in the kitchen.   The  tub was removed from the guest bathroom to replace with a shower only, including partial glass wall.  The guest bath also received a new vanity, fixtures and tile.

Written by Ronda Burson

Fort Myers Windows and Doors

April 2014:  Fort Myers, FL – After remodeling a bathroom in this 1954 built home, the homeowners decided to replace existing windows with new impact windows.  All interior doors and hardware were replaced.  Existing shingle roof was replaced with metal roof and cricket for chimney was built. Concrete slab was poured for a new lanai.

 

Written by Ronda Burson

City of Fort Myers Home Renovation

September 2014: Fort Myers, Florida – The master bathroom in this home included moving plumbing to relocate tub, toilet and vanity.  New closets were framed, as well as replacement of exterior doors with impact doors. Sliding glass doors were added and relocation of electrical. Popcorn ceilings were removed to modernize the home and some drywall was replaced.  Project was finished ahead of schedule.

Completion: October 2014