Written by Ronda Burson

Buckingham Custom Home

June 2015: Fort Myers, Florida –  Custom 2 bedroom, 2 bath home in Buckingham.  A coffered ceiling will enhance the master suite and great room.  The kitchen is complete with a walk-in pantry and bar that is open to the great room and separate dining area. The 1652 square foot living area also includes an office and inside laundry room. A covered lanai, front entryway and garage make this a 2428 square foot home.  The home site was cleared and well and septic was installed and driveway poured.

Written by Ronda Burson

Fort Myers Windows and Doors

April 2014:  Fort Myers, FL – After remodeling a bathroom in this 1954 built home, the homeowners decided to replace existing windows with new impact windows.  All interior doors and hardware were replaced.  Existing shingle roof was replaced with metal roof and cricket for chimney was built. Concrete slab was poured for a new lanai.

 

Written by Ronda Burson

Outdoor Kitchen Installed on Existing Lanai

December 2013:  Lehigh Acres, FL – This outdoor kitchen was installed on an existing lanai in Lehigh Acres, FL.  Installation included a built in grill and cambria countertop atop stacked stone and tile.  Reclaimed materials were used in this kitchen.

Scheduled for Completion:  December 2013

 


 

Written by Ronda Burson

Naples, FL Outdoor Kitchen Addition

December 2013:  Naples, FL – Perfect for Florida weather; this is a 2’x8′ extension of an existing wall with interior and exterior stucco to match, including  framing and sheeting.   This area will be used as an outdoor kitchen with barbeque grill and refrigerator.

Scheduled for Completion: February 2014


 

 

Written by Bethany Carter

August 2013: Bath & Kitchen Remodel

August 2013: Lehigh Acres, FL – This is the second set of remodels for this home. This time, the guest bathroom is to be completely gutted including flooring and all fixtures.
The kitchen is to be completely gutted, including flooring and fixtures as well as relocating plumbing lines.
The front entryway to also be reconfigured to accommodate door upgrade.

Scheduled for Completion: August 2013