• Commercial

    Small office build-outs or large commercial structures.

    read more
  • Custom Homes

    We want to build your last home; not your first home.

    read more
  • Remodel

    Remodeling can often be much more affordable and stress free than most owners expect.

    read more
  • Cabinets

    High quality, custom cabinets made in the USA.

    read more
  • Real Estate

    Now offering full-service real estate, Olde Florida Real Estate, Inc.

    read more

Category Archives: Construction Management

North Fort Myers Custom Home

April 2016:  North Fort Myers, Florida – This custom home includes 2599 sq ft of living area and 1147 sq ft of covered porches (both front and back).  This 3 bedroom, 2 1/2 bath home with inside laundry room consists of an owner’s suite with master bath, including walk in closets, shower, tub, double vanities Continue Reading

October 2013: Exterior Remodel

October 2013: Fort Myers, FL – This is an exterior remodel including Impact Window installation and siding replacement. Scheduled for Completion: November 2013    

September 2013: Kitchen Remodel

September 2013: Cape Coral, FL – This kitchen remodel will include new lighting, floors, appliances, cabinets, counters and plumbing. Scheduled for Completion: November 2013  

August 2013: Bathroom Remodel

August 2013: Fort Myers, FL – This extensive bathroom remodel includes reconfiguring and refinishing shower walls; floors, toilet, cabinetry. Wood flooring also to be installed in adjoining bedroom. Scheduled for Completion: October 2013

July 2013: Office Remodel

August 2013: Fort Myers, FL – Remodel of the DirectBuy office. This project includes a completely remodeled bathroom, including custom vanity. Wall modifications were made including painting, adding doorways and doors as well as building a storage closet. Completed: August 2013  

August 2013: Condo Remodel

August 2013: Fort Myers Beach, FL – This is a complete remodel on a Penthouse unit in the Terra Mar complex. The entire condo will be completely gutted and updated from floor to ceiling. The layout of the kitchen will be redesigned, as well as interior door reconfiguration to accommodate door upgrades. Estimated Completion: November Continue Reading

August 2013: Bath & Kitchen Remodel

August 2013: Lehigh Acres, FL – This is the second set of remodels for this home. This time, the guest bathroom is to be completely gutted including flooring and all fixtures. The kitchen is to be completely gutted, including flooring and fixtures as well as relocating plumbing lines. The front entryway to also be reconfigured Continue Reading

July 2013: Office Build Out

July 2013 Naples, FL – This project includes the addition of three interior walls, electrical and HVAC. Estimated Completion: August 2013  

June 2013: Condo Remodel

June 2013 Bonita Beach, FL – This is the 9th condo remodel in the BBC complex to date. The entire condo will be completely gutted and updated from floor to ceiling. Estimated Completion: October 2013

June 2011: Pool

June 2011 Fort Myers, FL – Performed as Construction Manager for the build of a new pool in Fort Myers, FL. This 15′ x 30′, in ground pool features a stamped concrete deck, LED in-pool lighting, heat system for year round enjoyment and a salt system (instead of traditional chlorine) for easy maintenance. The pool Continue Reading